BTR PEG III Week One: Seattle: Difference between revisions

Jump to navigation Jump to search
no edit summary
(Created page with "'''Planetary Emancipation Gridwork III: Build The Rod. Week One Intention: Set up HGS session space that is dedicated to the purposes of the Krystal Star Host communication ne...")
 
No edit summary
Line 1: Line 1:
PEG BTR Week One (3D): Third Dimensional Mother Arc Gate: Seattle Washington, Bainbridge, Puget Sound areas for the period of Saturday 9/6/2014 at 3pm PST to the following Saturday 9/13/2014.
'''Planetary Emancipation Gridwork III: Build The Rod. Week One Intention:
'''Planetary Emancipation Gridwork III: Build The Rod. Week One Intention:
Set up HGS session space that is dedicated to the purposes of the Krystal Star Host communication networks for Mother Arc to Build the Rod in her Arc Hub gateway 3D. Building the architecture required for Masculine Rod Function and CW Spin rate reset points for Krystal Hosting for Planetary Soul.'''
Set up HGS session space that is dedicated to the purposes of the Krystal Star Host communication networks for Mother Arc to Build the Rod in her Arc Hub gateway 3D. Building the architecture required for Masculine Rod Function and CW Spin rate reset points for Krystal Hosting for Planetary Soul.'''

Navigation menu