BTR PEG III Week Three: Antarctica
PEG BTR Week Three (9D): Ninth Dimensional Mother Arc Gate: Antarctica, 90 Degree East-West on Indian Ocean and Australian claims area for the period of Saturday 9/20/2014 at 3pm PST to the following Saturday 9/27/2014.
Week Three Intention: Set up HGS Session space that is dedicated to the Purposes of the Krystal Star Host communication networks for Mother Arc to Build the Rod in her Arc Hub gateway 9D. Building the architecture required for Masculine Rod Function and CW Spin rate reset points for Krystal Hosting for Planetary Soul.
(Transcript: TBD)