274
edits
(Created page with "'''Week Two Intention: Set up HGS Session space that is dedicated to the Purposes of the Krystal Star Host communication networks for Mother Arc to Build the Rod in her Arc Hu...") |
No edit summary |
||
| Line 1: | Line 1: | ||
'''PEG BTR Week Two (6D): Sixth Dimensional Mother Arc Gate: Ayers Rock, Uluru, Australia areas for the period of Saturday 9/13/2014 at 3pm PST to the following Saturday 9/20/2014.''' | |||
'''Week Two Intention: Set up HGS Session space that is dedicated to the Purposes of the Krystal Star Host communication networks for Mother Arc to Build the Rod in her Arc Hub gateway 6D. Building the architecture required for Masculine Rod Function and CW Spin rate reset points for Krystal Hosting for Planetary Soul.''' | '''Week Two Intention: Set up HGS Session space that is dedicated to the Purposes of the Krystal Star Host communication networks for Mother Arc to Build the Rod in her Arc Hub gateway 6D. Building the architecture required for Masculine Rod Function and CW Spin rate reset points for Krystal Hosting for Planetary Soul.''' | ||